PRODUCTS
Product Introduction:
This product is a one-coat paint with waterborne alkyd resin as the main film-forming matrix, featuring high solid content. It boasts excellent corrosion resistance, is easy to apply, and offers high cost-effectiveness.
Application fields:
Suitable for low and medium anti-corrosion and anti-rust requirements, it is applicable for surface protection of steel structure buildings with general requirements; mainly used for coating of C-shaped steel and H-shaped steel.
Technical Specifications:
project | parameter |
color | various colors |
finenessμm | ≤25 |
solid content·% | ≥42 |
gloss(60º) | 30 |
impact resistance·kg·cm | 50 |
Bend Test·mm | ≥2 |
Hardness (pencil) | ≥HB |
adhesion· | 0级 |
salt spray resistance·15d·h | 168h |
temperature | 5℃ | 15℃ | 25℃ | 35℃ | |
Natural drying time (Dry film 30 μ m, humidity 50%) | Table dry | 2h | 1h | 0.5h | 0.2h |
action-oriented | 24h | 12h | 12h | 12 | |
Painting kit:
Painting 1: Water-based alkyd primer and topcoat in one
Construction method:
Before painting, the painted surface must be treated to ensure that it is free of all contaminants such as oil stains, rust, dust, and impurities, and the substrate must be clean and dry;
Before painting, the paint should be mixed and stirred evenly according to the required ratio. If the viscosity is on the high side, deionized water within 10%-20% of the mixture can be added according to the corresponding ratio to adjust the spraying viscosity, and the mixture should be stirred thoroughly.
3. The spraying methods can include spraying, rolling, and brushing.
4. Construction should be carried out under weather conditions with a relative air humidity of less than 85%. It is necessary to avoid working in rain, snow, fog, or strong wind weather. The temperature for painting should be between 5℃ and 40℃.
Storage and transportation:
1. The product should be stored in a cool and ventilated place, protected from direct sunlight, and isolated from sources of ignition in the warehouse. The storage temperature should be maintained within the range of 5℃ to 35℃.
During transportation, attention should be paid to preventing the product from suffering quality loss due to exposure to severe cold, rain, sunlight, and collision. Additionally, transportation must comply with relevant national laws and regulations.
3. Under the above storage conditions, the product has a shelf life of at least 6 months; if it exceeds the shelf life, it can be tested according to the above indicators, and if it meets the technical indicator requirements, it can still be used.
Notes:
The construction site is well-ventilated, and it is necessary to wear a protective mask during spraying.
- Pre:Water-based alkyd primer
- Next:None